New Civil Engineer
Paul Kirkwood
-
Vale Royal Locks: Nose job
3 September 2009
The hardest part of rebuilding a new lock wall was dismantling the Grade-II listed original structure, as Paul Kirkwood reports from Cheshire.


Leader: Join the debate
Our future prosperity is in need of a clear, bold infrastructure vision
Antony Oliver NCE Editor
3 September 2009
The hardest part of rebuilding a new lock wall was dismantling the Grade-II listed original structure, as Paul Kirkwood reports from Cheshire.