Roof lift starts at London 2012 Aquatics site
Work is under way lifting the 2800-tonne wave-shaped roof of the Zaha Hadid and Arup designed London 2012 Aquatics Centre. The lift is considered one of the most complex engineering and construction challenges of the Olympic Park ‘big build’.
Subscriber only content
You must be either an ICE member or a subscriber to New Civil Engineer to read this article and receive complete, unrestricted access to nce.co.uk
ICE Member or NCE Subscriber:
Please sign in with your email address and click submit:









