Picture gallery: Massive machine positioned for Lee Tunnel
An 8m diameter tunnel boring machine (TBM) was yesterday lowered into a vast shaft, the deepest structure in London, in preparation to start work creating the 6.4km long Lee Tunnel.
Subscriber only content
You must be either an ICE member or a subscriber to New Civil Engineer to read this article and receive complete, unrestricted access to nce.co.uk
ICE Member or NCE Subscriber:
Please sign in with your email address and click submit:










